The 9th grade field improvements are nearly complete. The grass basepaths were installed just over two weeks ago and the sod is taking nicely. The grass along the backstop and near the enterances was installed last week and with the cool and wet weather also look good. The home plate area was raised about 6 inches and will drain nicely. More ag-lime will be added to the infield and the mound will be re-done in the next week or so. Thanks to everyone that has helped with this project. It looks great and will be a fantastic playing surface.